Not Found
MADHYA PRADESH QTY : 243

Items - Dismantling taking down old wooden locker,Demolation of PCC in ground floor,Taking down cement plaster on brick or stone wall surfaces,Material and labour for 10mm thick rendering,Material AND labour for preparation of new plastered surfaces of wall,Demolation of brickwork of stone boulder,Material and labour brickwork with sub class B brick,Dismantling of stone slabs and tiles,Kota stone slab 20-25 mm thick in riser of steps,Material and Labour for machine cut kota stone slab 20-25mm thick

Tender Details
Costs
Documents
BOQ
Item NumberItem TitleItem DescriptionItem QuantityUnit of MeasureConsignee IDDelivery Period (In number of days)
1 Dismantling taking down old wooden locker Dismantling taking down old wooden locker 100 Nos con6.mes.hbd 30
2 Demolation of PCC in ground floor Demolation of PCC in ground floor 11 Cum con6.mes.hbd 30
3 Taking down cement plaster on brick or stone wall surfaces Taking down cement plaster on brick or stone wall surfaces 11 Sqm con6.mes.hbd 30
4 Material and labour for 10mm thick rendering Material and labour for 10mm thick rendering 11 Sqm con6.mes.hbd 30
5 Material AND labour for preparation of new plastered surfaces of wall Material AND labour for preparation of new plastered surfaces of wall 11 Sqm con6.mes.hbd 30
6 Demolation of brickwork of stone boulder Demolation of brickwork of stone boulder 2 Cum con6.mes.hbd 30
7 Material and labour brickwork with sub class B brick Material and labour brickwork with sub class B brick 11 Sqm con6.mes.hbd 30
8 Dismantling of stone slabs and tiles Dismantling of stone slabs and tiles 8 Sqm con6.mes.hbd 30
9 Kota stone slab 20-25 mm thick in riser of steps Kota stone slab 20-25 mm thick in riser of steps 6 Sqm con6.mes.hbd 30
10 Material and Labour for machine cut kota stone slab 20-25mm thick Material and Labour for machine cut kota stone slab 20-25mm thick 72 Sqm con6.mes.hbd 30